On this Page... Latest News 2012 Street Resurfacing Program Project Background Construction Process Contact Us
Latest News (Updated May 16, 2012)
Diehl Road Resurfacing Continues Through June
The resurfacing project for Diehl Road from Wall Street to Raymond Drive is resuming Thursday, May 17, 2012, and will result in traffic being reduced to one way in each direction for the duration of the project. The project is scheduled to be complete in mid-June.
One lane of traffic is expected to remain open in each direction at all times.
Motorists are advised to seek an alternate route to avoid delays. The City will take necessary steps to minimize any inconvenience to residents, motorists, businesses and others. Area businesses have been notified of the project and motorists should utilize message boards along Diehl Road to stay up-to-date on changing traffic patterns.
Wildflower Subdivision Resurfacing
Resurfacing in the Wildflower Subdivision is expected to begin Monday, May 7, 2012.
2012 Street Resurfacing Program
The resurfacing work for 2012 Street Resurfacing Program will begin in May 2012 with an estimated completion date of October 2012. Affected residents will receive construction notices one week prior to start of work.
Several roads within the subdivisions of Breckenridge, Brookdale, Brush Hill, Cress Creek, In-Town East, In-Town West, Knoch Knolls, Old Farm, Old Saw Mill, Rose Hill, White Eagle and Wildflower are scheduled for road maintenance, renovation or restoration this year. In addition, several of the city’s major roadways are also slated for construction work, including:
- Washington Street - 5th Avenue to School Street
- Diehl Road - Rte. 59 to Raymond Drive
- Book Road - 87th Street to 111th Street
Click here for a map of roadways included in the program.
Click here to view a timeline for specific streets included in the program.
With the increase of construction activity in the summer months in Naperville and the surrounding region, the City would like to remind motorists to stay alert, use caution and abide by all traffic regulations when driving through construction zones. Click here for safe driving tips in construction zones.
Project Background
Funded by state and local motor fuel tax funds, Naperville's Street Resurfacing Program is designed to provide the city with safe, drivable roadway surfaces. The city's annual Street Maintenance Improvement Program consists of three major categories:
- Preventive Maintenance
- Resurfacing
- Reconstruction
Each year, the city evaluates its roadways and selects cost-effective maintenance treatments to enhance and extend the useful life of the pavement. When a pavement has deteriorated beyond the point of preventative maintenance and resurfacing, the pavement will be replaced.
Construction Process:
The goal of this project is to resurface the road and repair failing concrete infrastructure in the public right-of-way. To accomplish this, deteriorated curb through some driveways and storm structures will be removed and replaced before the street is resurfaced.
A city inspector will evaluate the curbs to determine if it negatively affects the street surface. Those identified curbs will be marked with a set of arrows facing each other to indicate the section of the the curb that is to be replaced at no cost to the homeowner. Please note that cracks in your curb do not necessarily indicate a need for replacement. Storm sewers will also be evaluated and replaced as part of the process.
City inspectors will also evaluate your sidewalk to see if it qualifies for the city's Sidewalk Replacement Program, which under city ordinance requires the city to assist property owners with the cost of sidewalk replacement. Through this cost-sharing initiative, the city is required to pay for 60 percent of the sidewalk replacement costs, while residents are responsible for the remaining 40 percent.
Deteriorated sidewalk squares in need of repair or replacement will be designated with a white "X" mark. One of the following conditions must exist for a sidewalk to be replaced using the city's Sidewalk Replacement Program:
- Sidewalk squares must be sunken or risen to a height difference of one inch or more between sections.
- Sidewalk squares must be broken or separated into three or more pieces.
- Sidewalk squares must have 50 percent or more of the surface deteriorated.

Curb Marked for Replacement

Sidewalk Marked for Replacement
In the case of asphalt driveway aprons, the City of Naperville will repair the affected driveway aprons. However, the city will not repair the driveway aprons with brick, stamped concrete, stones/gravels and other decorative materials. Since there is a higher replacement cost for brick and other decorative driveway aprons, the City Council voted to reimburse the homeowners for a portion of the repair costs. Brick driveways will have only the necessary bricks removed to complete the repairs. The bricks will then be stockpiled on the property. The property owner must then make arrangements to have them reset by a private brick driveway contractor. When driveway access is restricted, the overnight street parking restrictions in the area will be relaxed. During construction the roadway will be open to local traffic only.
Please note that all decorative landscaping, sprinkler systems and buried electronic fence equipment must be located, and clearly marked by the homeowner throughout the construction period. Maintaining the markings and protection of these items is the responsibility of the homeowner. The City of Naperville will not be responsible for damage to unmarked systems.
Contact Us:
The city welcomes comments and input including special coordination concerns from affected parties.
Questions and concerns regarding the city's Roadway Resurfacing Program can be directed to barir@naperville.il.us.
A list of frequently asked questions and answers (PDF) is also available.
Project Engineer:
Project Inspectors:
|